Aug 30, 2026 | Public Notices
The Town of Holyrood is pleased to advise residents that the new pump is working and operating successfully. With the pump now online, the immediate focus is to build water volume in the storage tank and gradually reintroduce water throughout the Town. To assist with...
Aug 30, 2026 | Public Notices
The Town of Holyrood is advising residents that an emergency water shut-off is now in effect as the Town continues to stabilize the municipal water system. Affected Areas Water service is currently shut off from the intersection of Conception Bay Highway and Salmonier...
Aug 30, 2026 | Public Notices
A leak has been identified and crews are now working to complete the necessary repairs. As a result, water service has been temporarily shut off from 261 Conception Bay Highway to the Conception Bay South boundary, including all side roads within this area. Crews are...
Aug 29, 2026 | Public Notices
Following today’s work on the Town’s water system, residents should now be receiving water service and have access to water pressure throughout the Town. As the system continues to stabilize, residents may experience: • Discoloured or cloudy water• Varying or...
Aug 29, 2026 | Public Notices
Council held a debriefing meeting this afternoon to discuss the Town’s current water situation, the work completed to date, and where we stand in completing the necessary repairs. We are happy to inform residents that a loaner pump has been secured and is being...